Concrete quantity calculator

Check net geometry and a separately chosen allowance before ordering concrete for an exercise. Do not hide a default waste percentage inside the volume formula.

Free results and workingNo signupLocal calculations
Your inputsCalculated on your device

Example values loaded. Replace them with your own measurements.

Your result
↗

Make the numbers make sense.

Enter your values, choose the units, and calculate. You’ll see the result and the working here.

Free results. No account needed.

The method

Rectangular V=Lwd; cylinder V=πD²h/4; total = count × V; adjusted = total × (1+allowance).

Before using the result

  • Simple net geometry; subtract openings or deductions separately. The allowance is user-selected, not a prescribed waste factor.

Worked examples

These original training examples illustrate the method for ACI Concrete Field Testing Technician - Grade I. Use the matching “Load example” button above to explore a variation; example values are not equipment settings or prescribed criteria.

1. Worked example

Check net geometry and a separately chosen allowance before ordering concrete for an exercise. Do not hide a default waste percentage inside the volume formula.

Shape
Slab or rectangular footing
Length
5 m
Width
3 m
Thickness/height
0.15 m
Quantity
1
User-selected additional allowance
10 %
  1. One element = 2.25 m³; net total = 2.25 × 1 m³.
  2. Adjusted = 2.25 × (1 + 0.1) m³.
  • Net volume: 2.25 m³
  • Allowance-adjusted volume: 2.475 m³

2. Comparison example

Compare a different supplied condition using the same method. For Construction Tutor, the important check is that the input meaning, units and method assumptions still match the problem.

Shape
Slab or rectangular footing
Length
5 m
Width
3 m
Thickness/height
0.15 m
Quantity
2
User-selected additional allowance
10 %
  1. One element = 2.25 m³; net total = 2.25 × 2 m³.
  2. Adjusted = 4.5 × (1 + 0.1) m³.
  • Net volume: 4.5 m³
  • Allowance-adjusted volume: 4.95 m³

Check your understanding

1. Which relationship is used?

Rectangular V=Lwd; cylinder V=πD²h/4; total = count × V; adjusted = total × (1+allowance).

2. Which assumption should you check first?

Simple net geometry; subtract openings or deductions separately. The allowance is user-selected, not a prescribed waste factor.

3. How should you verify a different unit system?

Convert every input to the displayed calculation units first. Equivalent physical inputs must give equivalent results; a unit label alone does not convert a number.