Quiz-summary
0 of 9 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 9 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- Answered
- Review
-
Question 1 of 9
1. Question
The compliance framework at an investment firm is being updated to address Mitigation Strategies as part of outsourcing. A challenge arises because the facility management vendor for the firm’s headquarters has failed to provide maintenance records for the backflow prevention assemblies in the main mechanical room for the past two fiscal years. An internal audit reveals that the building’s potable water system is at risk of contamination from the HVAC cooling towers. To mitigate this risk and align with National Standard Plumbing Code (NSPC) requirements, which action should the internal auditor recommend?
Correct
Correct: According to the National Standard Plumbing Code (NSPC) and general safety standards for cross-connection control, backflow prevention assemblies must be tested at the time of installation and at least annually thereafter by a certified tester. Establishing a formal testing schedule and maintaining a documentation log is the standard mitigation strategy to ensure the integrity of the potable water supply and regulatory compliance.
Incorrect: Installing air gaps is a valid method of backflow prevention, but it does not serve as a substitute for the required certification and testing of existing mechanical assemblies already in place. Pressure-reducing valves are used to control system pressure and do not provide protection against backflow or back-siphonage. Replacing reduced pressure zone (RPZ) assemblies with double check valve assemblies is inappropriate because RPZs provide a higher level of protection for high-hazard applications like cooling towers, and double check valves still require annual testing under the NSPC.
Takeaway: Effective mitigation of cross-connection risks requires regular, documented testing of backflow prevention assemblies by certified personnel as mandated by the NSPC.
Incorrect
Correct: According to the National Standard Plumbing Code (NSPC) and general safety standards for cross-connection control, backflow prevention assemblies must be tested at the time of installation and at least annually thereafter by a certified tester. Establishing a formal testing schedule and maintaining a documentation log is the standard mitigation strategy to ensure the integrity of the potable water supply and regulatory compliance.
Incorrect: Installing air gaps is a valid method of backflow prevention, but it does not serve as a substitute for the required certification and testing of existing mechanical assemblies already in place. Pressure-reducing valves are used to control system pressure and do not provide protection against backflow or back-siphonage. Replacing reduced pressure zone (RPZ) assemblies with double check valve assemblies is inappropriate because RPZs provide a higher level of protection for high-hazard applications like cooling towers, and double check valves still require annual testing under the NSPC.
Takeaway: Effective mitigation of cross-connection risks requires regular, documented testing of backflow prevention assemblies by certified personnel as mandated by the NSPC.
-
Question 2 of 9
2. Question
You have recently joined a private bank as compliance officer. Your first major assignment involves Insulation for Cold Climates during model risk, and an internal audit finding indicates that the plumbing design for several new regional branches does not meet the National Standard Plumbing Code (NSPC) for freeze protection. The audit specifically identifies water lines located in exterior walls that are susceptible to freezing during the winter months. To ensure the bank’s facilities comply with NSPC standards and mitigate the risk of property damage, which installation practice must be followed for these water lines?
Correct
Correct: According to the National Standard Plumbing Code (NSPC), plumbing systems must be protected from freezing. For piping installed in exterior walls or unconditioned spaces in cold climates, the code requires that the piping be placed on the heated side of the building’s thermal insulation. This allows the building’s internal climate control to keep the water in the pipes above freezing temperatures, supplemented by insulation or heat tracing where necessary.
Incorrect: Placing pipes on the cold side of the insulation would isolate them from the building’s heat, significantly increasing the risk of freezing. While grounding metallic pipes is a safety requirement, it does not provide heat to prevent freezing. Designing for seasonal decommissioning or manual draining is a maintenance strategy but does not satisfy the code requirement for protecting active, year-round water supply lines in exterior wall cavities.
Takeaway: To comply with NSPC freeze protection standards, water piping in exterior walls must be positioned on the heated side of the building insulation or provided with active heat sources.
Incorrect
Correct: According to the National Standard Plumbing Code (NSPC), plumbing systems must be protected from freezing. For piping installed in exterior walls or unconditioned spaces in cold climates, the code requires that the piping be placed on the heated side of the building’s thermal insulation. This allows the building’s internal climate control to keep the water in the pipes above freezing temperatures, supplemented by insulation or heat tracing where necessary.
Incorrect: Placing pipes on the cold side of the insulation would isolate them from the building’s heat, significantly increasing the risk of freezing. While grounding metallic pipes is a safety requirement, it does not provide heat to prevent freezing. Designing for seasonal decommissioning or manual draining is a maintenance strategy but does not satisfy the code requirement for protecting active, year-round water supply lines in exterior wall cavities.
Takeaway: To comply with NSPC freeze protection standards, water piping in exterior walls must be positioned on the heated side of the building insulation or provided with active heat sources.
-
Question 3 of 9
3. Question
An escalation from the front office at a payment services provider concerns Interoperability Standards during complaints handling. The team reports that the lack of adherence to Interoperability Standards between the facility management database and the enterprise resource planning (ERP) system has caused a failure in scheduling NSPC-mandated backflow preventer testing. This has led to a series of complaints from the local water authority and internal stakeholders. As an internal auditor performing a risk assessment, which of the following is the most significant risk associated with this interoperability failure?
Correct
Correct: The most significant risk in this scenario is the potential for cross-connection contamination. Under the National Standard Plumbing Code (NSPC), backflow prevention is a critical health and safety requirement. A failure in the interoperability of systems that manage these inspections directly increases the risk of contaminated water entering the potable supply, leading to severe legal liability, regulatory fines, and public health crises.
Incorrect
Correct: The most significant risk in this scenario is the potential for cross-connection contamination. Under the National Standard Plumbing Code (NSPC), backflow prevention is a critical health and safety requirement. A failure in the interoperability of systems that manage these inspections directly increases the risk of contaminated water entering the potable supply, leading to severe legal liability, regulatory fines, and public health crises.
-
Question 4 of 9
4. Question
When addressing a deficiency in Regulatory Engagement, what should be done first? During a large-scale commercial project, the local plumbing inspector issues a notice of non-compliance regarding the venting system’s configuration. The project manager believes the installation meets the intent of the National Standard Plumbing Code (NSPC), but the inspector has flagged it as a violation of the specific sizing requirements for circuit venting.
Correct
Correct: The first step in any regulatory dispute or deficiency notice is to perform a detailed review of the specific code sections cited by the Authority Having Jurisdiction (AHJ). This allows the professional to compare the installed work against the written requirements of the National Standard Plumbing Code (NSPC) and the inspector’s documented findings, ensuring any subsequent discussion or corrective action is based on facts and technical accuracy.
Incorrect: Requesting a variance is a secondary step used when code compliance is impossible due to unique circumstances, not a first response to a deficiency. Communicating with the owner about a dispute before fully analyzing the code basis is premature and can damage professional relationships. Modifying the system based on verbal comments without reviewing the written citation can lead to further errors and lacks the necessary documentation for compliance records.
Takeaway: The foundation of professional regulatory engagement is the objective analysis of cited code provisions against the actual installation before initiating corrective or escalatory actions.
Incorrect
Correct: The first step in any regulatory dispute or deficiency notice is to perform a detailed review of the specific code sections cited by the Authority Having Jurisdiction (AHJ). This allows the professional to compare the installed work against the written requirements of the National Standard Plumbing Code (NSPC) and the inspector’s documented findings, ensuring any subsequent discussion or corrective action is based on facts and technical accuracy.
Incorrect: Requesting a variance is a secondary step used when code compliance is impossible due to unique circumstances, not a first response to a deficiency. Communicating with the owner about a dispute before fully analyzing the code basis is premature and can damage professional relationships. Modifying the system based on verbal comments without reviewing the written citation can lead to further errors and lacks the necessary documentation for compliance records.
Takeaway: The foundation of professional regulatory engagement is the objective analysis of cited code provisions against the actual installation before initiating corrective or escalatory actions.
-
Question 5 of 9
5. Question
A stakeholder message lands in your inbox: A team is about to make a decision about Plumbing for Renewable Energy as part of change management at a mid-sized retail bank, and the message indicates that the internal audit department is reviewing the compliance of a new solar water heating installation. The audit focuses on the risk of cross-contamination between the glycol-based heat transfer loop and the bank’s potable water system. According to the National Standard Plumbing Code (NSPC) and standard risk control frameworks, which configuration is required to mitigate the risk of fluid mixing?
Correct
Correct: The National Standard Plumbing Code (NSPC) requires that heat exchangers using non-potable heat transfer fluids, such as glycol, must be of double-wall construction. This design includes an intermediate space (interstitial space) that is vented to the atmosphere, ensuring that a leak in either the potable or non-potable wall is detected visually and drained away before cross-contamination can occur.
Incorrect: Automated shut-off valves and sensors are considered active controls but do not meet the passive safety requirement of physical separation mandated by the NSPC for non-potable fluids. Backflow preventers at the service entrance protect the municipal supply but fail to protect the building’s internal occupants from the solar loop. While dyes are useful for troubleshooting, they are not a code-compliant substitute for a double-wall heat exchanger.
Takeaway: To prevent potable water contamination in renewable energy systems, the NSPC mandates double-wall heat exchangers with visible leak detection when non-potable transfer fluids are used.
Incorrect
Correct: The National Standard Plumbing Code (NSPC) requires that heat exchangers using non-potable heat transfer fluids, such as glycol, must be of double-wall construction. This design includes an intermediate space (interstitial space) that is vented to the atmosphere, ensuring that a leak in either the potable or non-potable wall is detected visually and drained away before cross-contamination can occur.
Incorrect: Automated shut-off valves and sensors are considered active controls but do not meet the passive safety requirement of physical separation mandated by the NSPC for non-potable fluids. Backflow preventers at the service entrance protect the municipal supply but fail to protect the building’s internal occupants from the solar loop. While dyes are useful for troubleshooting, they are not a code-compliant substitute for a double-wall heat exchanger.
Takeaway: To prevent potable water contamination in renewable energy systems, the NSPC mandates double-wall heat exchangers with visible leak detection when non-potable transfer fluids are used.
-
Question 6 of 9
6. Question
Working as the client onboarding lead for a mid-sized retail bank, you encounter a situation involving Plumbing for Project Management during third-party risk. Upon examining an incident report, you discover that a plumbing contractor for a new branch facility failed to submit the required isometric drawings for the venting system to the local jurisdiction 10 business days before the scheduled rough-in. The contractor argues that since the project uses standard materials and follows the NSPC, the plan review is a formality that can be completed after the piping is installed but before it is covered. Based on professional project management standards and the NSPC, how should this compliance gap be addressed?
Correct
Correct: According to the National Standard Plumbing Code (NSPC) and standard administrative procedures for plumbing projects, no plumbing system or part thereof shall be installed, altered, or repaired until a permit has been issued by the administrative authority. Plans and specifications must be submitted and approved prior to the start of work to ensure the design complies with health and safety standards. Proceeding without a permit is a violation of the code and creates significant regulatory and operational risk.
Incorrect: Allowing work to continue with a performance bond is incorrect because financial instruments do not satisfy the legal requirement for code compliance and safety oversight. Documenting the deviation in a risk register is a project management step but does not resolve the underlying code violation. Hiring a third-party firm to certify the work cannot legally replace the mandatory plan review and permitting process required by the local jurisdiction’s administrative authority.
Takeaway: Plumbing work must never commence until the administrative authority has reviewed the plans and issued the necessary permits to ensure code compliance and safety.
Incorrect
Correct: According to the National Standard Plumbing Code (NSPC) and standard administrative procedures for plumbing projects, no plumbing system or part thereof shall be installed, altered, or repaired until a permit has been issued by the administrative authority. Plans and specifications must be submitted and approved prior to the start of work to ensure the design complies with health and safety standards. Proceeding without a permit is a violation of the code and creates significant regulatory and operational risk.
Incorrect: Allowing work to continue with a performance bond is incorrect because financial instruments do not satisfy the legal requirement for code compliance and safety oversight. Documenting the deviation in a risk register is a project management step but does not resolve the underlying code violation. Hiring a third-party firm to certify the work cannot legally replace the mandatory plan review and permitting process required by the local jurisdiction’s administrative authority.
Takeaway: Plumbing work must never commence until the administrative authority has reviewed the plans and issued the necessary permits to ensure code compliance and safety.
-
Question 7 of 9
7. Question
A regulatory inspection at a wealth manager focuses on Stakeholder Engagement in the context of conflicts of interest. The examiner notes that the firm’s facilities director, who is also a licensed master plumber, personally oversaw and signed off on the installation of a high-capacity water heating system and associated gas piping. The internal auditor finds that no external permits were pulled for this 120-gallon installation, as the director claimed their professional expertise superseded the need for municipal oversight. To address this control deficiency and ensure compliance with the National Standard Plumbing Code (NSPC), which action should the auditor recommend?
Correct
Correct: The National Standard Plumbing Code (NSPC) and standard internal audit practices require that all significant plumbing installations undergo a formal permitting and inspection process by the authority having jurisdiction (AHJ). A stakeholder’s professional licensure does not exempt them from regulatory oversight, and an independent inspection is necessary to mitigate the conflict of interest and ensure the safety of the gas piping and water heating systems.
Incorrect
Correct: The National Standard Plumbing Code (NSPC) and standard internal audit practices require that all significant plumbing installations undergo a formal permitting and inspection process by the authority having jurisdiction (AHJ). A stakeholder’s professional licensure does not exempt them from regulatory oversight, and an independent inspection is necessary to mitigate the conflict of interest and ensure the safety of the gas piping and water heating systems.
-
Question 8 of 9
8. Question
A procedure review at an audit firm has identified gaps in Plumbing for Advanced Testing and Validation as part of gifts and entertainment. The review highlights that during the final inspection of a multi-story commercial drainage system, the lead inspector accepted luxury suite tickets from the plumbing contractor just prior to signing off on the hydrostatic test results. The audit team is concerned that the required 10-foot head of water pressure was not maintained for the full 15-minute duration as mandated by the National Standard Plumbing Code (NSPC). To mitigate the risk of system failure and ensure regulatory compliance, which internal control should the audit team recommend for future advanced testing and validation?
Correct
Correct: Implementing independent third-party verification and digital data logging provides an objective, verifiable trail that the NSPC-mandated 10-foot head of water pressure was maintained for the required duration, effectively mitigating the risk of compromised inspections due to ethical breaches or human error.
Incorrect: Focusing on ethics policy disclosure does not provide technical assurance that the plumbing system meets safety standards. Relying on contractor affidavits lacks the necessary independent oversight required when a conflict of interest is suspected. Substituting air for water testing is a procedural change that does not address the underlying validation integrity issue and may be restricted by safety codes for certain materials like plastic.
Takeaway: Robust plumbing validation relies on objective data and independent oversight to ensure that technical safety standards are met regardless of external influences.
Incorrect
Correct: Implementing independent third-party verification and digital data logging provides an objective, verifiable trail that the NSPC-mandated 10-foot head of water pressure was maintained for the required duration, effectively mitigating the risk of compromised inspections due to ethical breaches or human error.
Incorrect: Focusing on ethics policy disclosure does not provide technical assurance that the plumbing system meets safety standards. Relying on contractor affidavits lacks the necessary independent oversight required when a conflict of interest is suspected. Substituting air for water testing is a procedural change that does not address the underlying validation integrity issue and may be restricted by safety codes for certain materials like plastic.
Takeaway: Robust plumbing validation relies on objective data and independent oversight to ensure that technical safety standards are met regardless of external influences.
-
Question 9 of 9
9. Question
In your capacity as operations manager at a mid-sized retail bank, you are handling Vulnerability Management during periodic review. A colleague forwards you a board risk appetite review pack showing that the institution has a zero-tolerance policy for health-related building code violations and environmental hazards. During a physical inspection of the facility’s mechanical room, you identify that a high-pressure steam boiler used for the building’s climate control is connected directly to the potable water system. The connection lacks a visible air gap or a reduced pressure principle backflow preventer (RPZ). According to the National Standard Plumbing Code (NSPC) regarding cross-connection control, what is the most appropriate action to mitigate this vulnerability?
Correct
Correct: The National Standard Plumbing Code (NSPC) classifies boilers, especially those containing chemicals or operating under high pressure, as high-hazard cross-connections. For such installations, the code mandates the use of a reduced pressure principle backflow preventer (RPZ) or a physical air gap to prevent backflow or back-siphonage of non-potable water into the potable water system. This aligns with the board’s zero-tolerance policy for health-related vulnerabilities.
Incorrect: Atmospheric vacuum breakers are unsuitable for this scenario because they cannot be used under continuous pressure or for high-hazard applications where back-pressure may occur. Internal dual check valves are generally not considered sufficient protection for high-hazard cross-connections under the NSPC without an intermediate atmospheric vent or higher-level protection. Relying on pressure monitoring is a procedural control that does not meet the physical engineering requirements of the plumbing code for permanent backflow prevention.
Takeaway: High-hazard plumbing cross-connections must be protected by a reduced pressure principle backflow preventer or an air gap to satisfy safety standards and code compliance.
Incorrect
Correct: The National Standard Plumbing Code (NSPC) classifies boilers, especially those containing chemicals or operating under high pressure, as high-hazard cross-connections. For such installations, the code mandates the use of a reduced pressure principle backflow preventer (RPZ) or a physical air gap to prevent backflow or back-siphonage of non-potable water into the potable water system. This aligns with the board’s zero-tolerance policy for health-related vulnerabilities.
Incorrect: Atmospheric vacuum breakers are unsuitable for this scenario because they cannot be used under continuous pressure or for high-hazard applications where back-pressure may occur. Internal dual check valves are generally not considered sufficient protection for high-hazard cross-connections under the NSPC without an intermediate atmospheric vent or higher-level protection. Relying on pressure monitoring is a procedural control that does not meet the physical engineering requirements of the plumbing code for permanent backflow prevention.
Takeaway: High-hazard plumbing cross-connections must be protected by a reduced pressure principle backflow preventer or an air gap to satisfy safety standards and code compliance.