Quiz-summary
0 of 10 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
An incident ticket at a mid-sized retail bank is raised about Renewable Energy Technologies during whistleblowing. The report states that the solar photovoltaic (PV) system installed at the new regional headquarters, which was intended to meet the carbon reduction targets for a BREEAM Excellent rating, has not been functionally connected to the building’s electrical distribution system. The whistleblower alleges that the project team plans to submit the final certification evidence based on the physical presence of the panels rather than their operational status. Which action should the BREEAM Associate recommend to ensure the project remains compliant with BREEAM’s requirements for low carbon technologies?
Correct
Correct: BREEAM requires that Low or Zero Carbon (LZC) technologies are not only installed but are also commissioned and integrated into the building’s energy supply to count towards carbon reduction credits. The Associate must ensure that the energy strategy accurately reflects the actual contribution of the technology to the building’s performance, supported by commissioning evidence and proper integration into the energy model.
Incorrect: Claiming credits based on peak rating without functional integration is incorrect because BREEAM measures the actual reduction in regulated emissions through the energy model. Purchasing REGOs or green tariffs is a procurement strategy and does not satisfy the technical requirements for on-site LZC technology credits under the Energy category. Innovation credits are reserved for novel solutions and cannot be used to bypass the standard requirements for energy credits that have already been targeted in the design stage.
Takeaway: BREEAM credits for renewable energy require evidence of both physical installation and functional commissioning to ensure a genuine reduction in the building’s carbon footprint.
Incorrect
Correct: BREEAM requires that Low or Zero Carbon (LZC) technologies are not only installed but are also commissioned and integrated into the building’s energy supply to count towards carbon reduction credits. The Associate must ensure that the energy strategy accurately reflects the actual contribution of the technology to the building’s performance, supported by commissioning evidence and proper integration into the energy model.
Incorrect: Claiming credits based on peak rating without functional integration is incorrect because BREEAM measures the actual reduction in regulated emissions through the energy model. Purchasing REGOs or green tariffs is a procurement strategy and does not satisfy the technical requirements for on-site LZC technology credits under the Energy category. Innovation credits are reserved for novel solutions and cannot be used to bypass the standard requirements for energy credits that have already been targeted in the design stage.
Takeaway: BREEAM credits for renewable energy require evidence of both physical installation and functional commissioning to ensure a genuine reduction in the building’s carbon footprint.
-
Question 2 of 10
2. Question
A gap analysis conducted at a fund administrator regarding Approved Document OV Conservation of Fuel and Power in Buildings other than Dwellings as part of transaction monitoring concluded that the current building management system (BMS) lacks the granularity required to report sub-metered energy consumption by end-use category. The facility manager noted that while total energy use is tracked, the specific requirements for monitoring lighting, heating, and cooling separately are not being met. This deficiency was identified during a pre-certification review for a major commercial asset scheduled for completion in Q4. Which of the following actions should the internal auditor recommend to align the project with the energy monitoring requirements of the regulatory framework?
Correct
Correct: Approved Document requirements for non-dwellings mandate that energy-consuming systems (such as heating, ventilation, and lighting) must be sub-metered so that at least 90% of the estimated annual energy consumption of each fuel can be assigned to various end-use categories. Installing sub-meters and integrating them into a centralized system ensures that the building can be managed effectively, meeting both regulatory standards and BREEAM’s energy management criteria.
Incorrect: Increasing manual readings of the main meter does not provide the necessary breakdown of energy use by specific system, which is a core requirement for non-dwellings. Reclassifying the building is an inappropriate compliance workaround that does not address the actual energy performance or the legal requirements for the building’s actual use. Relying on design-stage estimates is insufficient for operational compliance, as actual performance must be monitored to identify and correct inefficiencies.
Takeaway: Compliance with energy conservation regulations for non-dwellings requires granular sub-metering of major energy-consuming systems to enable effective performance monitoring and management.
Incorrect
Correct: Approved Document requirements for non-dwellings mandate that energy-consuming systems (such as heating, ventilation, and lighting) must be sub-metered so that at least 90% of the estimated annual energy consumption of each fuel can be assigned to various end-use categories. Installing sub-meters and integrating them into a centralized system ensures that the building can be managed effectively, meeting both regulatory standards and BREEAM’s energy management criteria.
Incorrect: Increasing manual readings of the main meter does not provide the necessary breakdown of energy use by specific system, which is a core requirement for non-dwellings. Reclassifying the building is an inappropriate compliance workaround that does not address the actual energy performance or the legal requirements for the building’s actual use. Relying on design-stage estimates is insufficient for operational compliance, as actual performance must be monitored to identify and correct inefficiencies.
Takeaway: Compliance with energy conservation regulations for non-dwellings requires granular sub-metering of major energy-consuming systems to enable effective performance monitoring and management.
-
Question 3 of 10
3. Question
During a routine supervisory engagement with a credit union, the authority asks about Ecological Value of Site in the context of control testing. They observe that the organization is planning a major expansion of its regional headquarters and intends to achieve a BREEAM Excellent rating. During the audit of the Land Use and Ecology category, the internal auditor identifies that the project team is currently in the concept design stage, approximately 18 months before the scheduled start on site. To ensure the integrity of the ecological assessment and maximize credit potential, which control procedure should the auditor verify is in place?
Correct
Correct: In the BREEAM framework, the Land Use and Ecology category emphasizes the importance of establishing an accurate ecological baseline. The most effective control is the early engagement of a Suitably Qualified Ecologist (SQE). The SQE must conduct a site survey prior to any site clearance or preparation to identify existing ecological features and provide recommendations for protection and enhancement. This ensures that the assessment is based on the actual state of the land before it is disturbed, which is a fundamental requirement for achieving credits related to ecological value.
Incorrect: Relying on a lead contractor to develop a landscape plan without specialist ecological input often leads to the selection of non-native or inappropriate species that do not support local biodiversity. Using satellite imagery or national maps as primary evidence is insufficient for a BREEAM assessment, as it lacks the site-specific detail required for a professional ecological survey. Restricting ecological enhancements only to brownfield sites is a strategic error, as BREEAM encourages the protection and enhancement of biodiversity on all site types, regardless of their previous use or contamination status.
Takeaway: Effective ecological value assessment in BREEAM requires the early appointment of a Suitably Qualified Ecologist to establish a pre-clearance baseline and guide enhancement strategies.
Incorrect
Correct: In the BREEAM framework, the Land Use and Ecology category emphasizes the importance of establishing an accurate ecological baseline. The most effective control is the early engagement of a Suitably Qualified Ecologist (SQE). The SQE must conduct a site survey prior to any site clearance or preparation to identify existing ecological features and provide recommendations for protection and enhancement. This ensures that the assessment is based on the actual state of the land before it is disturbed, which is a fundamental requirement for achieving credits related to ecological value.
Incorrect: Relying on a lead contractor to develop a landscape plan without specialist ecological input often leads to the selection of non-native or inappropriate species that do not support local biodiversity. Using satellite imagery or national maps as primary evidence is insufficient for a BREEAM assessment, as it lacks the site-specific detail required for a professional ecological survey. Restricting ecological enhancements only to brownfield sites is a strategic error, as BREEAM encourages the protection and enhancement of biodiversity on all site types, regardless of their previous use or contamination status.
Takeaway: Effective ecological value assessment in BREEAM requires the early appointment of a Suitably Qualified Ecologist to establish a pre-clearance baseline and guide enhancement strategies.
-
Question 4 of 10
4. Question
Following an alert related to Protection and Enhancement of Biodiversity, what is the proper response? A project team is developing a brownfield site and discovers a previously unidentified habitat of local importance during the early design stage. To maximize credits under the BREEAM Land Use and Ecology category and ensure compliance with sustainability principles, how should the team proceed?
Correct
Correct: BREEAM emphasizes the role of a Suitably Qualified Ecologist (SQE) to provide professional expertise in identifying and protecting ecological features. To achieve higher credits in the Land Use and Ecology category, the assessment must be based on site-specific data and recommendations that align with local biodiversity priorities, ensuring that enhancements provide genuine ecological value.
Incorrect: The approach of using a landscape architect for general native planting is insufficient because BREEAM requires the technical expertise of an SQE for specific ecological credits. Relocating habitats off-site is often considered a last resort and may not satisfy the requirements for protecting on-site biodiversity. Using a standard set of measures like bird boxes without site-specific ecological advice fails to meet the BREEAM requirement for tailored recommendations based on the unique characteristics of the site.
Takeaway: Achieving BREEAM biodiversity credits requires the early involvement of a Suitably Qualified Ecologist to provide site-specific recommendations that protect existing features and enhance local ecology.
Incorrect
Correct: BREEAM emphasizes the role of a Suitably Qualified Ecologist (SQE) to provide professional expertise in identifying and protecting ecological features. To achieve higher credits in the Land Use and Ecology category, the assessment must be based on site-specific data and recommendations that align with local biodiversity priorities, ensuring that enhancements provide genuine ecological value.
Incorrect: The approach of using a landscape architect for general native planting is insufficient because BREEAM requires the technical expertise of an SQE for specific ecological credits. Relocating habitats off-site is often considered a last resort and may not satisfy the requirements for protecting on-site biodiversity. Using a standard set of measures like bird boxes without site-specific ecological advice fails to meet the BREEAM requirement for tailored recommendations based on the unique characteristics of the site.
Takeaway: Achieving BREEAM biodiversity credits requires the early involvement of a Suitably Qualified Ecologist to provide site-specific recommendations that protect existing features and enhance local ecology.
-
Question 5 of 10
5. Question
You have recently joined an investment firm as MLRO. Your first major assignment involves Approved Document QQ Conservation of Fuel and Power in Buildings other than Dwellings during control testing, and a policy exception request indicate that a commercial property’s building management system (BMS) is not configured to provide the specific energy consumption data required for annual carbon reporting. The property manager requests to use aggregate utility bills instead of the granular data specified in the compliance manual. As an internal auditor, which action best addresses the risk of non-compliance with energy conservation standards?
Correct
Correct: Approved Document QQ and BREEAM standards emphasize the importance of granular data for energy management. Granular data allows for the identification of specific inefficiencies and is a fundamental requirement for verifying conservation efforts and regulatory compliance. Relying on aggregate data prevents the firm from meeting the detailed reporting and monitoring standards necessary for sustainability governance.
Incorrect: Applying a safety margin to aggregate data does not satisfy the regulatory requirement for granular monitoring and fails to provide actionable insights for energy reduction. Setting a threshold based on regional averages ignores the absolute compliance requirements of the conservation document. Third-party sign-off on aggregate data does not address the underlying lack of detail required for effective energy control and BREEAM assessment credits.
Takeaway: Effective energy conservation and BREEAM compliance rely on the implementation of granular monitoring systems as specified in regulatory documents to ensure accurate performance tracking.
Incorrect
Correct: Approved Document QQ and BREEAM standards emphasize the importance of granular data for energy management. Granular data allows for the identification of specific inefficiencies and is a fundamental requirement for verifying conservation efforts and regulatory compliance. Relying on aggregate data prevents the firm from meeting the detailed reporting and monitoring standards necessary for sustainability governance.
Incorrect: Applying a safety margin to aggregate data does not satisfy the regulatory requirement for granular monitoring and fails to provide actionable insights for energy reduction. Setting a threshold based on regional averages ignores the absolute compliance requirements of the conservation document. Third-party sign-off on aggregate data does not address the underlying lack of detail required for effective energy control and BREEAM assessment credits.
Takeaway: Effective energy conservation and BREEAM compliance rely on the implementation of granular monitoring systems as specified in regulatory documents to ensure accurate performance tracking.
-
Question 6 of 10
6. Question
The compliance officer at an investment firm is tasked with addressing BREEAM Scheme Assessment Process during onboarding. After reviewing an internal audit finding, the key concern is that a development project has marketed its sustainability performance based solely on an Interim Certificate. The audit notes that the construction phase is 95% complete, yet the project team has not engaged the BREEAM Assessor for the final stage of the certification process. Which of the following correctly identifies the BREEAM procedural requirement for finalizing the assessment?
Correct
Correct: In the BREEAM New Construction scheme, the assessment process is typically divided into two distinct stages: the Design Stage (resulting in an Interim Certificate) and the Post-Construction Stage (resulting in the Final Certificate). The Post-Construction Stage is a mandatory requirement for a final rating to ensure that the building as-built actually meets the criteria and credits claimed during the design phase. This involves the BREEAM Assessor reviewing as-built evidence and often performing a site visit.
Incorrect: Option B is incorrect because the BREEAM Assessor must independently verify as-built evidence and cannot rely solely on a contractor’s guarantee to issue a final certificate. Option C is incorrect because BREEAM is a voluntary third-party certification process that is independent of mandatory local building control or occupancy permits. Option D is incorrect because the BREEAM process requires a final assessment for all projects seeking full certification, regardless of whether changes were made to the design, to maintain the integrity and accuracy of the rating.
Takeaway: BREEAM certification requires a two-stage verification process to ensure that design-stage sustainability goals are successfully translated into the final as-built project.
Incorrect
Correct: In the BREEAM New Construction scheme, the assessment process is typically divided into two distinct stages: the Design Stage (resulting in an Interim Certificate) and the Post-Construction Stage (resulting in the Final Certificate). The Post-Construction Stage is a mandatory requirement for a final rating to ensure that the building as-built actually meets the criteria and credits claimed during the design phase. This involves the BREEAM Assessor reviewing as-built evidence and often performing a site visit.
Incorrect: Option B is incorrect because the BREEAM Assessor must independently verify as-built evidence and cannot rely solely on a contractor’s guarantee to issue a final certificate. Option C is incorrect because BREEAM is a voluntary third-party certification process that is independent of mandatory local building control or occupancy permits. Option D is incorrect because the BREEAM process requires a final assessment for all projects seeking full certification, regardless of whether changes were made to the design, to maintain the integrity and accuracy of the rating.
Takeaway: BREEAM certification requires a two-stage verification process to ensure that design-stage sustainability goals are successfully translated into the final as-built project.
-
Question 7 of 10
7. Question
Which description best captures the essence of Hazardous Waste Management for BREEAM Associate? In the context of a major refurbishment project where the pre-demolition audit has identified significant quantities of asbestos-containing materials and lead-based paints, which strategy most effectively demonstrates the application of BREEAM principles regarding hazardous waste?
Correct
Correct: BREEAM emphasizes the importance of a Site Waste Management Plan (SWMP) and the waste hierarchy. Effective hazardous waste management requires early identification (pre-demolition audits) and strict segregation at the source. This prevents the contamination of other waste streams, which is essential for maximizing the recycling and recovery of non-hazardous materials. Furthermore, using verified and licensed facilities ensures that the environmental impact is mitigated in accordance with legal and ethical standards.
Incorrect: Integrating hazardous waste into general streams after stabilization is often legally prohibited and risks widespread contamination if the stabilization is incomplete. Prioritizing cost and timeline over specialized handling ignores the significant health and safety risks and environmental liabilities associated with hazardous substances. Storing hazardous materials indefinitely on-site to save on transport emissions creates a significant localized environmental hazard and typically violates safety regulations regarding the temporary storage of dangerous goods.
Takeaway: Effective hazardous waste management in BREEAM centers on rigorous segregation at the source to protect human health and preserve the integrity of recyclable waste streams.
Incorrect
Correct: BREEAM emphasizes the importance of a Site Waste Management Plan (SWMP) and the waste hierarchy. Effective hazardous waste management requires early identification (pre-demolition audits) and strict segregation at the source. This prevents the contamination of other waste streams, which is essential for maximizing the recycling and recovery of non-hazardous materials. Furthermore, using verified and licensed facilities ensures that the environmental impact is mitigated in accordance with legal and ethical standards.
Incorrect: Integrating hazardous waste into general streams after stabilization is often legally prohibited and risks widespread contamination if the stabilization is incomplete. Prioritizing cost and timeline over specialized handling ignores the significant health and safety risks and environmental liabilities associated with hazardous substances. Storing hazardous materials indefinitely on-site to save on transport emissions creates a significant localized environmental hazard and typically violates safety regulations regarding the temporary storage of dangerous goods.
Takeaway: Effective hazardous waste management in BREEAM centers on rigorous segregation at the source to protect human health and preserve the integrity of recyclable waste streams.
-
Question 8 of 10
8. Question
Excerpt from a customer complaint: In work related to Renewable Energy Technologies as part of control testing at a payment services provider, it was noted that the sustainability reporting for the new headquarters lacked a formal feasibility study for the installed biomass boiler. The complaint, filed by a minority shareholder, alleges that the decision-making process for selecting renewable sources was opaque and did not consider the long-term operational impact or local air quality. As a BREEAM Associate reviewing this internal audit finding, what is the critical requirement for demonstrating compliance with the Low and Zero Carbon (LZC) technologies credit?
Correct
Correct: Under BREEAM standards, specifically within the energy category, the Low and Zero Carbon (LZC) technologies credit requires a site-specific feasibility study. This study must be conducted by a qualified energy specialist to ensure that the chosen technologies are appropriate for the building’s location, energy profile, and long-term economic viability, while also considering environmental factors like local air quality.
Incorrect: Procuring energy through a power purchase agreement (PPA) relates to operational energy sourcing rather than the design and installation of on-site LZC technologies required for this credit. Installing technology without a feasibility study fails to meet BREEAM’s requirement for a structured, evidence-based selection process. While building management systems and energy efficiency are vital for overall BREEAM performance, they are addressed in different credits and do not fulfill the specific requirement for evaluating and implementing renewable energy sources.
Takeaway: BREEAM compliance for renewable energy requires a documented, specialist-led feasibility study to ensure that selected technologies are site-appropriate and sustainable over their life cycle.
Incorrect
Correct: Under BREEAM standards, specifically within the energy category, the Low and Zero Carbon (LZC) technologies credit requires a site-specific feasibility study. This study must be conducted by a qualified energy specialist to ensure that the chosen technologies are appropriate for the building’s location, energy profile, and long-term economic viability, while also considering environmental factors like local air quality.
Incorrect: Procuring energy through a power purchase agreement (PPA) relates to operational energy sourcing rather than the design and installation of on-site LZC technologies required for this credit. Installing technology without a feasibility study fails to meet BREEAM’s requirement for a structured, evidence-based selection process. While building management systems and energy efficiency are vital for overall BREEAM performance, they are addressed in different credits and do not fulfill the specific requirement for evaluating and implementing renewable energy sources.
Takeaway: BREEAM compliance for renewable energy requires a documented, specialist-led feasibility study to ensure that selected technologies are site-appropriate and sustainable over their life cycle.
-
Question 9 of 10
9. Question
Which safeguard provides the strongest protection when dealing with Approved Document QV Conservation of Fuel and Power in Buildings other than Dwellings? During an internal audit of a large-scale commercial development project, the audit team identifies a significant risk that the actual energy performance may deviate from the carbon emission targets established during the design phase. To mitigate the risk of non-compliance with conservation requirements and to ensure long-term operational efficiency, which of the following control measures offers the most comprehensive assurance?
Correct
Correct: Independent post-construction energy monitoring and seasonal commissioning provide the strongest safeguard because they address the performance gap between design and operation. By validating actual system behavior against the energy model used for Document QV compliance, the organization ensures that the building functions as intended across all seasons, providing objective evidence of fuel and power conservation.
Incorrect: Relying on contractor warranties is a financial and reactive measure that does not ensure energy efficiency or regulatory compliance. Pre-tender reviews of SBEM calculations are necessary but only address theoretical performance, not actual operational outcomes. Site inspections of insulation materials are a basic quality control for the building fabric but fail to address the complex mechanical and electrical systems that represent the majority of energy use in non-dwellings.
Takeaway: The most effective safeguard for energy conservation compliance is the integration of independent verification with operational performance monitoring to ensure design intent meets actual building behavior.
Incorrect
Correct: Independent post-construction energy monitoring and seasonal commissioning provide the strongest safeguard because they address the performance gap between design and operation. By validating actual system behavior against the energy model used for Document QV compliance, the organization ensures that the building functions as intended across all seasons, providing objective evidence of fuel and power conservation.
Incorrect: Relying on contractor warranties is a financial and reactive measure that does not ensure energy efficiency or regulatory compliance. Pre-tender reviews of SBEM calculations are necessary but only address theoretical performance, not actual operational outcomes. Site inspections of insulation materials are a basic quality control for the building fabric but fail to address the complex mechanical and electrical systems that represent the majority of energy use in non-dwellings.
Takeaway: The most effective safeguard for energy conservation compliance is the integration of independent verification with operational performance monitoring to ensure design intent meets actual building behavior.
-
Question 10 of 10
10. Question
When addressing a deficiency in Carbon Emissions Calculation and Reduction, what should be done first? A project team has discovered that the initial Life Cycle Assessment (LCA) for a new commercial development failed to account for several high-impact structural components, leading to an underestimation of embodied carbon. To rectify this and align with BREEAM standards for carbon reduction, what is the most appropriate initial action?
Correct
Correct: Re-evaluating the assessment boundary is the critical first step because BREEAM requires a comprehensive Life Cycle Assessment (LCA) that covers specific building elements such as the substructure, frame, and upper floors. If components were missed, the scope must be corrected to ensure the data is robust and representative of the actual environmental impact before any reduction strategies or material specifications can be effectively applied.
Incorrect: Implementing carbon offsetting is considered a last resort in sustainability hierarchies and does not address the fundamental accuracy of the assessment. Substituting data with generic averages without first verifying the scope leads to inaccurate results and may fail to meet the technical rigor required for BREEAM credits. Focusing only on operational energy ignores the embodied carbon impact of the materials, which is a distinct and significant part of the building’s total life cycle impact that must be addressed independently.
Takeaway: Accurate carbon reduction begins with defining a comprehensive and correct assessment boundary that encompasses all significant life cycle stages and building components.
Incorrect
Correct: Re-evaluating the assessment boundary is the critical first step because BREEAM requires a comprehensive Life Cycle Assessment (LCA) that covers specific building elements such as the substructure, frame, and upper floors. If components were missed, the scope must be corrected to ensure the data is robust and representative of the actual environmental impact before any reduction strategies or material specifications can be effectively applied.
Incorrect: Implementing carbon offsetting is considered a last resort in sustainability hierarchies and does not address the fundamental accuracy of the assessment. Substituting data with generic averages without first verifying the scope leads to inaccurate results and may fail to meet the technical rigor required for BREEAM credits. Focusing only on operational energy ignores the embodied carbon impact of the materials, which is a distinct and significant part of the building’s total life cycle impact that must be addressed independently.
Takeaway: Accurate carbon reduction begins with defining a comprehensive and correct assessment boundary that encompasses all significant life cycle stages and building components.