Quiz-summary
0 of 8 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 8 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- Answered
- Review
-
Question 1 of 8
1. Question
A client relationship manager at a payment services provider seeks guidance on Leak testing of piping systems and components as part of internal audit remediation. They explain that their firm recently acquired a healthcare facility management subsidiary and discovered inconsistencies in the verification logs for a newly installed medical gas manifold. During the review of the standing pressure test records for the positive pressure piping, it was noted that the test was terminated early. To meet NFPA 99 requirements for system verification, what specific parameters must the standing pressure test satisfy?
Correct
Correct: According to NFPA 99, the standing pressure test for positive pressure medical gas piping systems must be performed after the initial pressure test. The system is required to be pressurized to 20 percent above the normal operating pressure and held for 24 hours. The test is successful only if there is zero pressure change, with the only exception being fluctuations caused by changes in the ambient temperature.
Incorrect: A 12-hour duration is insufficient as the standard mandates a 24-hour period to ensure even slow leaks are detected. Allowing a pressure drop of 1 psi or 5 psi is incorrect because the standard requires zero leakage. Testing at 150 percent of working pressure or 50 percent above operating pressure describes the initial pressure test or other specific tests, but not the 24-hour standing pressure test required for final verification.
Takeaway: The standing pressure test for medical gas piping requires a 24-hour duration at 20 percent above operating pressure with zero allowable leakage.
Incorrect
Correct: According to NFPA 99, the standing pressure test for positive pressure medical gas piping systems must be performed after the initial pressure test. The system is required to be pressurized to 20 percent above the normal operating pressure and held for 24 hours. The test is successful only if there is zero pressure change, with the only exception being fluctuations caused by changes in the ambient temperature.
Incorrect: A 12-hour duration is insufficient as the standard mandates a 24-hour period to ensure even slow leaks are detected. Allowing a pressure drop of 1 psi or 5 psi is incorrect because the standard requires zero leakage. Testing at 150 percent of working pressure or 50 percent above operating pressure describes the initial pressure test or other specific tests, but not the 24-hour standing pressure test required for final verification.
Takeaway: The standing pressure test for medical gas piping requires a 24-hour duration at 20 percent above operating pressure with zero allowable leakage.
-
Question 2 of 8
2. Question
A regulatory inspection at a fund administrator focuses on Compliance with building codes and standards in the context of complaints handling. The examiner notes that during the audit of a healthcare facility’s new medical gas infrastructure, the documentation for the brazed joints in the Category 1 oxygen piping is incomplete. To ensure the system meets NFPA 99 standards for medical gas and vacuum systems, the verifier must confirm that the personnel who performed the brazing were qualified under which specific standard?
Correct
Correct: According to NFPA 99, specifically in the sections governing the installation of medical gas and vacuum systems, all brazing procedures and the performance of the brazers must be qualified in accordance with either ASME Section IX, ‘Boiler and Pressure Vessel Code,’ or AWS B2.2, ‘Standard for Brazing Procedure and Performance Qualification.’ The verifier’s role is to ensure that these specific certifications are documented and valid for the specific joints made during installation.
Incorrect: ASSE 6010 and 6040 refer to the professional qualifications for medical gas installers and maintenance personnel, respectively, but they are not the technical standards used to qualify the brazing process itself. ASTM B819 specifies the requirements for the copper tubing used in medical gas systems, and ASTM B828 relates to soldering rather than the brazing required for medical gas. ANSI/ASHRAE Standard 15 is a safety standard for refrigeration systems and is not applicable to the qualification of medical gas brazing.
Takeaway: NFPA 99 requires that all medical gas brazing be performed by individuals qualified to ASME Section IX or AWS B2.2 standards to ensure the structural integrity of the piping system.
Incorrect
Correct: According to NFPA 99, specifically in the sections governing the installation of medical gas and vacuum systems, all brazing procedures and the performance of the brazers must be qualified in accordance with either ASME Section IX, ‘Boiler and Pressure Vessel Code,’ or AWS B2.2, ‘Standard for Brazing Procedure and Performance Qualification.’ The verifier’s role is to ensure that these specific certifications are documented and valid for the specific joints made during installation.
Incorrect: ASSE 6010 and 6040 refer to the professional qualifications for medical gas installers and maintenance personnel, respectively, but they are not the technical standards used to qualify the brazing process itself. ASTM B819 specifies the requirements for the copper tubing used in medical gas systems, and ASTM B828 relates to soldering rather than the brazing required for medical gas. ANSI/ASHRAE Standard 15 is a safety standard for refrigeration systems and is not applicable to the qualification of medical gas brazing.
Takeaway: NFPA 99 requires that all medical gas brazing be performed by individuals qualified to ASME Section IX or AWS B2.2 standards to ensure the structural integrity of the piping system.
-
Question 3 of 8
3. Question
The monitoring system at a payment services provider has flagged an anomaly related to Pressure testing of piping systems during data protection. Investigation reveals that a medical gas systems verifier is auditing the installation of a new medical air system in a facility’s clinical laboratory. During the review of the 24-hour standing pressure test documentation, the verifier notes that the initial pressure was 60 psi, but the final pressure was 58 psi. The contractor noted that the temperature in the room dropped from 80°F to 65°F during the test period. According to NFPA 99, how should the verifier proceed with the evaluation of this test?
Correct
Correct: NFPA 99 allows for the 24-hour standing pressure test to be adjusted for temperature variations. Since gases expand and contract with temperature changes, a drop in pressure that corresponds to a drop in absolute temperature (using the Rankine or Kelvin scale) does not necessarily indicate a leak. The verifier must verify the calculation to ensure the drop is purely thermal and that no actual gas loss occurred.
Incorrect: Rejecting the test immediately is incorrect because physical laws dictate that pressure will change with temperature, and NFPA 99 explicitly recognizes this relationship. Increasing the pressure to 150 psi is a requirement for the initial leak test or cross-connection testing, not the 24-hour standing test. A flat 5% tolerance is not a standard NFPA 99 metric; the standard requires zero leakage after accounting for temperature fluctuations.
Takeaway: In medical gas system verification, the 24-hour standing pressure test must account for ambient temperature changes using absolute temperature scales to distinguish between thermal contraction and actual leaks.
Incorrect
Correct: NFPA 99 allows for the 24-hour standing pressure test to be adjusted for temperature variations. Since gases expand and contract with temperature changes, a drop in pressure that corresponds to a drop in absolute temperature (using the Rankine or Kelvin scale) does not necessarily indicate a leak. The verifier must verify the calculation to ensure the drop is purely thermal and that no actual gas loss occurred.
Incorrect: Rejecting the test immediately is incorrect because physical laws dictate that pressure will change with temperature, and NFPA 99 explicitly recognizes this relationship. Increasing the pressure to 150 psi is a requirement for the initial leak test or cross-connection testing, not the 24-hour standing test. A flat 5% tolerance is not a standard NFPA 99 metric; the standard requires zero leakage after accounting for temperature fluctuations.
Takeaway: In medical gas system verification, the 24-hour standing pressure test must account for ambient temperature changes using absolute temperature scales to distinguish between thermal contraction and actual leaks.
-
Question 4 of 8
4. Question
Which consideration is most important when selecting an approach to Medical Gas System Maintenance and Repair? A facility manager is overseeing the replacement of a faulty pressure regulating valve in a medical oxygen line that serves a surgical suite. The repair requires the system to be breached and a section of the piping to be temporarily isolated.
Correct
Correct: According to NFPA 99 and ASSE 6000 standards, any breach of the medical gas system for repair or maintenance necessitates a formal verification process. This is critical because the integrity of the system must be re-established to prevent cross-connections and ensure that no contaminants, such as particulates or moisture, were introduced during the repair. A certified verifier must confirm that the gas delivered to the patient remains pure and that the system functions as intended before it is returned to service.
Incorrect: Using reclaimed components is a violation of safety standards as it introduces unknown risks regarding contamination and mechanical fatigue. Scheduling repairs during peak hours is a poor risk management strategy that maximizes potential harm to patients if the system fails during the procedure. Visual inspection is never sufficient for medical gas systems; pressure testing, cross-connection testing, and purity analysis are mandatory requirements to ensure life safety.
Takeaway: Any maintenance or repair that breaches a medical gas system requires comprehensive verification testing, including purity and cross-connection checks, to ensure patient safety and regulatory compliance.
Incorrect
Correct: According to NFPA 99 and ASSE 6000 standards, any breach of the medical gas system for repair or maintenance necessitates a formal verification process. This is critical because the integrity of the system must be re-established to prevent cross-connections and ensure that no contaminants, such as particulates or moisture, were introduced during the repair. A certified verifier must confirm that the gas delivered to the patient remains pure and that the system functions as intended before it is returned to service.
Incorrect: Using reclaimed components is a violation of safety standards as it introduces unknown risks regarding contamination and mechanical fatigue. Scheduling repairs during peak hours is a poor risk management strategy that maximizes potential harm to patients if the system fails during the procedure. Visual inspection is never sufficient for medical gas systems; pressure testing, cross-connection testing, and purity analysis are mandatory requirements to ensure life safety.
Takeaway: Any maintenance or repair that breaches a medical gas system requires comprehensive verification testing, including purity and cross-connection checks, to ensure patient safety and regulatory compliance.
-
Question 5 of 8
5. Question
When a problem arises concerning Zone valve operational testing, what should be the immediate priority? During a verification of a newly installed medical gas system in a surgical suite, a verifier discovers that closing the zone valve labeled for Operating Room 1 fails to terminate the gas flow to the outlets in that room, while simultaneously cutting off flow to the adjacent recovery area.
Correct
Correct: According to NFPA 99 and ASSE 6030 standards, zone valves must be accurately labeled and control only the specific areas they are designated to serve. If a valve controls the wrong area, it indicates a critical installation error such as a cross-connection or incorrect labeling. The priority is to reconcile the physical piping with the approved design documents to ensure that emergency shut-off procedures will function as intended for patient safety.
Incorrect: Increasing system pressure is a method for leak testing but does not address a routing or mapping error where the wrong room is being served. Replacing the valve components is premature and ineffective if the issue is the piping layout rather than a mechanical failure of the valve itself. Adjusting alarm panels to match an incorrect installation is a violation of safety codes and would lead to confusion and potential harm during a real emergency.
Takeaway: The primary goal of zone valve operational testing is to ensure that the physical piping layout matches the labeling and design specifications for specific patient care areas to prevent life-safety failures during emergencies.
Incorrect
Correct: According to NFPA 99 and ASSE 6030 standards, zone valves must be accurately labeled and control only the specific areas they are designated to serve. If a valve controls the wrong area, it indicates a critical installation error such as a cross-connection or incorrect labeling. The priority is to reconcile the physical piping with the approved design documents to ensure that emergency shut-off procedures will function as intended for patient safety.
Incorrect: Increasing system pressure is a method for leak testing but does not address a routing or mapping error where the wrong room is being served. Replacing the valve components is premature and ineffective if the issue is the piping layout rather than a mechanical failure of the valve itself. Adjusting alarm panels to match an incorrect installation is a violation of safety codes and would lead to confusion and potential harm during a real emergency.
Takeaway: The primary goal of zone valve operational testing is to ensure that the physical piping layout matches the labeling and design specifications for specific patient care areas to prevent life-safety failures during emergencies.
-
Question 6 of 8
6. Question
A stakeholder message lands in your inbox: A team is about to make a decision about Understanding of other relevant industry standards (e.g., CGA, ANSI) as part of data protection at a private bank, and the message indicates that during the final verification phase of a new medical gas manifold installation, there is a dispute regarding the specific technical requirements for cylinder valve connections. The facility manager believes that NFPA 99 provides all necessary details, but the verification team insists on referencing specific Compressed Gas Association (CGA) documents to confirm the non-interchangeability of the gas-specific connections. As the ASSE 6030 Verifier, you must identify the correct industry standard that governs the dimensional specifications for these valve outlets to ensure patient safety and system integrity.
Correct
Correct: CGA V-1 is the industry standard that defines the specific dimensions and threading for cylinder valve outlets and inlets. This ensures that different gases cannot be accidentally cross-connected, which is a critical safety requirement referenced by NFPA 99 and verified under ASSE 6030 protocols to maintain the integrity of the medical gas delivery system.
Incorrect: CGA G-4.1 focuses on the cleaning of equipment for oxygen service rather than the physical dimensions of connections. ANSI/ASME B16.22 pertains to the specifications of copper fittings used in the piping system, not the cylinder valves. CGA P-1 provides general safety guidelines for handling containers but does not provide the technical dimensional specifications for valve outlets required for non-interchangeability.
Takeaway: ASSE 6030 Verifiers must recognize CGA V-1 as the definitive standard for ensuring the non-interchangeability of medical gas cylinder connections through precise dimensional specifications.
Incorrect
Correct: CGA V-1 is the industry standard that defines the specific dimensions and threading for cylinder valve outlets and inlets. This ensures that different gases cannot be accidentally cross-connected, which is a critical safety requirement referenced by NFPA 99 and verified under ASSE 6030 protocols to maintain the integrity of the medical gas delivery system.
Incorrect: CGA G-4.1 focuses on the cleaning of equipment for oxygen service rather than the physical dimensions of connections. ANSI/ASME B16.22 pertains to the specifications of copper fittings used in the piping system, not the cylinder valves. CGA P-1 provides general safety guidelines for handling containers but does not provide the technical dimensional specifications for valve outlets required for non-interchangeability.
Takeaway: ASSE 6030 Verifiers must recognize CGA V-1 as the definitive standard for ensuring the non-interchangeability of medical gas cylinder connections through precise dimensional specifications.
-
Question 7 of 8
7. Question
During a committee meeting at a fund administrator, a question arises about Identification of potential hazards associated with medical gas systems as part of regulatory inspection. The discussion reveals that a healthcare facility within the fund’s portfolio has been storing full oxygen cylinders in a maintenance closet alongside cleaning supplies and cardboard packaging. Which of the following identifies the primary hazard associated with this storage configuration according to NFPA 99?
Correct
Correct: According to NFPA 99, the storage of oxidizing gases (such as oxygen and nitrous oxide) in the same vicinity as combustible materials is a major safety hazard. Oxidizers do not burn themselves but they support combustion, meaning they can cause a fire to burn much more intensely and spread more rapidly than it would in normal air. This is why NFPA 99 requires specific separation distances or fire-rated enclosures and ventilation for medical gas storage.
Incorrect: While physical damage to valves is a legitimate safety concern, it is not the primary hazard defined by the presence of combustibles in a storage area. Oxygen leakage would create an oxygen-enriched atmosphere, not an oxygen-deficient one; oxygen-deficient atmospheres are a hazard associated with inert gases like nitrogen or carbon dioxide. Medical gases are generally chemically stable and do not react with standard cleaning vapors to create toxic byproducts in a storage environment.
Takeaway: The most critical hazard in medical gas storage is the fire-accelerating nature of oxidizing gases when they are not properly isolated from combustible materials and heat sources.
Incorrect
Correct: According to NFPA 99, the storage of oxidizing gases (such as oxygen and nitrous oxide) in the same vicinity as combustible materials is a major safety hazard. Oxidizers do not burn themselves but they support combustion, meaning they can cause a fire to burn much more intensely and spread more rapidly than it would in normal air. This is why NFPA 99 requires specific separation distances or fire-rated enclosures and ventilation for medical gas storage.
Incorrect: While physical damage to valves is a legitimate safety concern, it is not the primary hazard defined by the presence of combustibles in a storage area. Oxygen leakage would create an oxygen-enriched atmosphere, not an oxygen-deficient one; oxygen-deficient atmospheres are a hazard associated with inert gases like nitrogen or carbon dioxide. Medical gases are generally chemically stable and do not react with standard cleaning vapors to create toxic byproducts in a storage environment.
Takeaway: The most critical hazard in medical gas storage is the fire-accelerating nature of oxidizing gases when they are not properly isolated from combustible materials and heat sources.
-
Question 8 of 8
8. Question
What is the primary risk associated with Medical Gas System Verification and Inspection, and how should it be mitigated? During the final verification of a newly installed medical gas distribution system in a high-acuity surgical suite, a verifier must ensure the system is safe for patient use. Given the complexity of multiple gas lines (Oxygen, Medical Air, and Nitrous Oxide) running in close proximity within the ceiling plenum, which approach best addresses the most critical life-safety risk?
Correct
Correct: The most critical life-safety risk in medical gas systems is the delivery of the wrong gas (cross-connection) or contaminated gas to a patient. According to NFPA 99 and ASSE 6030 standards, the verifier must perform a cross-connection test to ensure that when a specific gas source is pressurized, only the corresponding outlets for that gas deliver flow. Furthermore, gas concentration and purity testing must be performed at every outlet to ensure the gas delivered is what is intended and meets the required purity standards.
Incorrect: While mechanical joint failure and pressure integrity are important, a standing pressure test alone does not ensure the correct gas is in the correct pipe. Insufficient flow capacity is a performance issue but is generally considered secondary to the immediate life-safety threat of a cross-connection. Alarm notification is a critical monitoring component, but testing alarms does not mitigate the risk of the underlying gas supply being incorrect or contaminated at the point of use.
Takeaway: The primary objective of medical gas verification is to prevent patient injury by confirming gas identity and purity through rigorous cross-connection and concentration testing.
Incorrect
Correct: The most critical life-safety risk in medical gas systems is the delivery of the wrong gas (cross-connection) or contaminated gas to a patient. According to NFPA 99 and ASSE 6030 standards, the verifier must perform a cross-connection test to ensure that when a specific gas source is pressurized, only the corresponding outlets for that gas deliver flow. Furthermore, gas concentration and purity testing must be performed at every outlet to ensure the gas delivered is what is intended and meets the required purity standards.
Incorrect: While mechanical joint failure and pressure integrity are important, a standing pressure test alone does not ensure the correct gas is in the correct pipe. Insufficient flow capacity is a performance issue but is generally considered secondary to the immediate life-safety threat of a cross-connection. Alarm notification is a critical monitoring component, but testing alarms does not mitigate the risk of the underlying gas supply being incorrect or contaminated at the point of use.
Takeaway: The primary objective of medical gas verification is to prevent patient injury by confirming gas identity and purity through rigorous cross-connection and concentration testing.